Production
User Manual articles for L2L Production Module
- Rescheduling Build Sequences
- Red Exclamation Point ( ! )
- Pitch Method API Pro Tips
- Product Orders API - Pro Troubleshooting Tip
- Scrap/Defect Type vs. Scrap/Defect Category
- Order Routing Templates
- Methods of Adding Scrap
- Operator Portal Edit Pitch Modal
- Pro Tip: Why Your Actual Changeover Duration and Changeover Dispatch Time are Different
- Pro Tip: Production Start Time Explained
- Concurrent Production Process Flow
- 📕Setup - Product Categories
- Product Documents on the Operator Portal
- 📕Production: Pitchboards
- What Controls the Number of eKanban Orders Visible in the Operator Portal
- Putting Product Orders On-Hold
- eKanban Scheduling: Minimal Changeovers vs. Heijunka Ideal
- Using Line Cycle Times by Operator Count
- What Is the Shopping Cart Icon as seen in the Production Module?
- Production Module - Inadvertently Deleted Shift(s)
- How to Cancel Product Orders
- Product Order Imports
- 📕Production - Products/Components
- Pro Tip - Recovering Inadvertently Deleted Pitches
- Pitch Demand
- Pro Tip: Build Sequences/sync_order_details API
- Pitch Record vs. Pitch Details
- Pro Tip: eKanban Product Orders via API / Integrations when different parts are built
- Pitch Pace & Pace Metrics
- 📕 Production - Settings