Multiple Resources or Multiple Dispatches for One Machine?

Comments

1 comment

  • Curtis Bird

    SO im thinking a possibility would be that you already have a code red down so just do a follow-up work order for the electrician. You could create a Electrician Priority dispatch type if you wanted but the original call will track the downtime. Then if you wanted you could create a new status called "Waiting for electrician" and have the mechanic change the status when he or she leaves to go to another call. Im sure there are other ways as well.

    Originally answered May 1, 2015 at 3:57 pm