0

Assigning Multiple Resourcess In Scheduer

Would be nice to have a faster way to assign resoucres in the Scheduler list.  Currently have to go through entire Facilty names to pick out only certain people in Department.  I have 32 Technicains and have to chose them indiviually which is very time consuming.  Maybe assign by reorce group or Department??

0 comments

Please sign in to leave a comment.