How do I report on overdue preventive maintenance by timeframe?
Last updated: November 19, 2026
Use the Dispatch History report to review overdue preventive maintenance (PM) dispatches over a specific timeframe without manually counting entries in the Scheduler calendar. Use the Scheduler list when you need to review the schedules associated with overdue PMs instead of individual dispatch records.
Report on overdue PM dispatches
Open the Dispatch History report.
Select the timeframe you want to review.
Filter by the PM dispatch type.
Filter by the relevant status, such as open or not completed, and apply the past-due filter.
This is the recommended reporting method when you need overdue PM visibility beyond the dashboard view.
Review and export overdue PM schedules
Open the Scheduler in list view.
Filter by dispatch type and status to identify schedules with overdue PMs.
Export the filtered results if you need to review or share the schedule list.
The distinction is important: Dispatch History shows individual dispatch records, while the Scheduler list helps you review the underlying schedules.
You can also review past-due maintenance work in the Maintenance Planner.
Understand how PM generation affects the results
PM schedules can be configured to prevent a new PM dispatch from being generated until the current dispatch is managed and closed. This avoids duplicate PM dispatches, but requires someone to:
Assign a resource when the work can be performed.
Close the dispatch after the work is complete.
Once the current dispatch is closed, the next PM will generate on its due date.
The system may still count missed PMs even when it does not generate a new dispatch for each missed cycle. As a result, missed-PM counts may not match the number of visible dispatch records. Account for this behavior when interpreting missed or overdue maintenance results.
Scope of these reporting methods
These methods provide visibility into overdue PM dispatches and schedules. They do not establish a dashboard configuration for all requested statuses or a method for calculating production standard work completion rates.