Non-Production vs. Non-Productive Minutes
Last updated: June 19, 2026
Non-Production Minutes
Non-Production Minutes are primarily planned periods of downtime: scheduled PMs, lunches, breaks, safety meetings, fire drills, etc. Possibly changeovers, training, and similar times when it is not possible to build product.
Non-Productive Minutes
Non-Productive minutes refers to those periods of time during which it is possible to produce, to build product; i.e. there are no active Down-Impacting Dispatches open and the line or cell is running. Another term for Non-Productive Minutes is Non-Execution time.
Non-Productive Minutes metric is designed for you to be able to see the impact downtime has on the operator time. The calculation for NPM is Operator Count x Downtime minutes.
Example: During the shift, you have 60 minutes of downtime and there were 2 operators on the line. So for this line, your NPM would be 120 minutes. (2x60=120)
Really that's 2 operators for 60 minutes engaged in non-value added work during the line downtime event measured in minutes.
Non-Productive Minutes (NPM) can be viewed in the following areas.
Operator Portal and Pitch boards for the line
Daily and weekly production summaries reports
Raw pitch board data
Production status dashboards for area and line